Plant Uptake Of Heavy Metal Pollution At Riverview Eastside And Potential For Phytoremediation

Loading...
Thumbnail Image
Authors
Robertson, Xochitl
Issue Date
2023
Type
Presentation
Language
en_US
Keywords
Research Projects
Organizational Units
Journal Issue
Alternative Title
Abstract
This project was a continuation of prior work done studying the local Kalamazoo Riverview Eastside site (KRE), which currently stands as a brownfield site. Soil sampling and testing, vegetation surveying, and bioindicator surveillance had already been conducted giving insight into on-site conditions leading to this, one of hopefully several more steps that may lead to the restoration of this site via phytoremediation. Goals: Gain an understanding of heavy metal uptake within KRE vegetation. Find potential phytoremediators to help generate phytoremediation-centered cleanup strategies for the site.
Description
1 Broadside. 48"W x 36"H
Citation
Publisher
Kalamazoo, Mich. : Kalamazoo College
License
U.S. copyright laws protect this material. Commercial use or distribution of this material is not permitted without prior written permission of the copyright holder.
Journal
Volume
Issue
PubMed ID
DOI
ISSN
EISSN