The Production of Steroids at the Upjohn Company: A Simulation
Loading...
Authors
Foote, Robert
Issue Date
1976
Type
Thesis
Language
en_US
Keywords
Alternative Title
Abstract
I was introduced to the problem which was to receive my attention for the balance of the quarter: the designing of a computer tool which would be of assistance in the
scheduling of steroid production. This report contains a detailed description of my approach to the
problem. My main goal has been to write a dynamic algorithm, that is,
an algorithm with deoision-making devices sensitive both to the external
parameters of the system and to internal changes.
Description
iv, 93 p.
Citation
Publisher
Kalamazoo College
License
U.S. copyright laws protect this material. Commercial use or distribution of this material is not permitted without prior written permission of the copyright holder.